Summer sale now on
  1. Home
  2. >
  3. Products
  4. >
  5. Parts
  6. >
  7. Page 20

Parts

Filters
Brands

Stiga Deck Blade Tip Kit 1134-9053-01

£32.93

Stiga Deck Pivot Wheel Assembly 1134-5884-01

£70.42

Stiga Lawnmower Height Adjust Knob 122394501/0

£6.28

Stiga Lawnmower Height Adjust Lever 322321537/0

£8.98

Stiga Mountfield Blade Bolt Hex-Head 112736815/0

£10.39

Stiga Mountfield Lawnmower 210mm Wheel Assembly 381007498/0

£34.40

Stiga Mountfield Lawnmower Blade Boss 17mm 322463190/0

£13.78

Save 19%

Stiga Mountfield Oil & Fuel Extractor Kit 1134-9188-01

Original price was: £30.99.Current price is: £25.02.

Stiga Mountfield Park 110 Deck Drive Belt 4WD 1134-9108-01

£60.88

Save 18%

Stiga Mountfield PTO Drive Belt 4WD 1134-9098-01

Original price was: £38.99.Current price is: £31.98.

Save 20%

Stiga Mountfield SAE30 Engine Oil 1.4 Litre 1111-9236-01

Original price was: £23.99.Current price is: £19.28.

Stiga Mountfield Universal Fuel Stabiliser 100ml MS1211

£11.65

Stiga Park 340/540/740 PTO Drive Belt 4WD 1134-9199-01

£67.37

Save 17%

Stiga PTO Drive Belt Villa Royal 1134-9066-01

Original price was: £52.99.Current price is: £43.93.

Stiga Tractor Chain Lock 1134-2824-01

£13.01

Save 17%

Stiga Tractor PTO Drive Belt 1134-9172-01

Original price was: £42.99.Current price is: £35.53.

Stiga Transmission Drive Belt A102 135062002/1

£81.26

Stiga Villa Steering Cable 1134-2032-03

£70.55

Transmission with Pulley

£699.00

Save 17%

Winged Blade SLM 420

Original price was: £30.99.Current price is: £25.60.

Our reviews

Why Spring Is the Most Important Time for Lawn Care

Read blog

The Sun Is Out: Is Your Lawn Mower Ready for the Season?

Read blog

How to Fix a Lawn After Winter Damage

Read blog

Late Winter Garden Jobs to Do Before Spring Arrives

Read blog

Preparing Your Garden for Spring: Essential Jobs to Do Now

Read blog

Electric vs Petrol Lawn Mowers in Cold Weather

Read blog

Our Promise

90 day guarantee

Changed your mind? Just let us know within 90 days—as long as the item’s unused, in original packaging, and you have your order or invoice number, we’ll sort it. Email us to arrange the return. Once we’ve received and checked the item, we’ll refund you to your original payment method.

Price match promise

At Mowers‑Online, we want you to get the best deal. If you spot the exact same product for less elsewhere, just email us the details—and we’ll match the price. It’s simple, fair, and designed to save you money.

Finance available

Changed your mind? Just let us know within 90 days—as long as the item’s unused, in original packaging, and you have your order or invoice number, we’ll sort it. Email us to arrange the return. Once we’ve received and checked the item, we’ll refund you to your original payment method.
0